CN  |  EN
TEL
Follow
Rail transit
Guangzhou Metro
  • Product overview
  • Technical specifications
  • Installation instructions
Guangzhou Metro Line 1
Introduction:
Guangzhou Metro Line 1 (English: Guangzhou MetroLine 1) is the first urban rail transit line operated by Guangzhou City. It is relatively busy and is known as the aorta of the Guangzhou Metro Line. Guangzhou Metro Line 1 connects to several subway lines, and can achieve a single-line transfer, and connect to the Guangfo line, which can complete the fast transfer from Guangzhou to Foshan. Connect the Xitun of Liwan District to Guangzhou East Station of Tianhe District. The line representative color is yellow. The train consists of 6 A-cars. Guangzhou Metro Line 1 runs from southwest to northeast. It starts from the Xilang Station on the southwestern ground. It goes underground on the way to Huadiwan Station. It extends along Huadi Avenue to Fangcun Station, and passes through the Pearl River and the sand. Jiyong to Huangsha Station, east of Congui Road, west of Baohua Road, east of Huagui Road to Longjin Road, and then built into the built-up area. After arriving at Zhongshan 7th Road, it will advance along Zhongshan Avenue to reach densely populated, commercial concentrated and busy people. The area, then under the Guangzhou Avenue and Tianhe Village to the Sports West Road, after the Tianhe South Road, after wearing the Zhengjia Square, and then through the East Road and Linhe Road to the north, enter the Guangzhou East Station and turn to the northwest to reach the end of Guangzhou East station. The total length of the line is 18.497 kilometers, including 2.048 kilometers on the ground and 16.449 kilometers on the underground. After its completion, it greatly eased the traffic pressure of the Pearl River Tunnel, Zhongshan Road and Zhujiang Bridge, strengthened the connection between the Fangcun area and the central city, and also facilitated the access of Guangzhou-Shenzhen Railway and Guangzhou-Kowloon through train users to Guangzhou City. The distance between Guangzhou and Shenzhen and Hong Kong. The depot of Guangzhou Metro Line 1 is the Xilang Depot, located in the west of Xilang Station and Hangkou Station. The control center is located in the park front control center in the superstructure of the park front station, and is shared with Guangzhou Metro Line 2 and Guangzhou Metro Line 8.
Adopt Huayi cable products:
1) Low-smoke halogen-free super five network cable;
2) RV type copper core PVC connection software wire;
3) BV type copper core PVC insulated wire;
4) BVV copper core PVC insulated PVC sheathed wire and cable;
5) RVS type copper core PVC insulated stranded flexible cable;
6) SYV series solid core PVC insulated PVC sheathed coaxial cable;
7) RVV type copper core PVC insulated PVC sheathed flexible cable;
8) RVVP copper core PVC insulated and sheathed PVC sheathed flexible cable;
9) WDZN-RYS type copper core polyolefin insulated stranded flexible cable (low smoke and halogen free combustion resistant fire);
10) WDNH-RYYP copper core polyolefin insulated polyolefin sheath braided and shielded flexible cable (low smoke and halogen free fire);
11) WDZBN-BYJS copper core cross-linked polyolefin insulated stranded cable (low smoke zero halogen flame retardant grade B fire resistant);
12) DYWL-RYSP copper core cross-linked polyolefin insulated stranded braided shielded cable (low smoke and halogen free);
13) HYV series telephone line;
14) Super five types of network cable.
Guangzhou Metro Line 2
Introduction:
The first section of Guangzhou Metro Line 2 (Sanyuanli-Xiaogang) began trial operation on December 29, 2002. On June 28, 2003, the Guangzhou Metro Line 2 Sanyuanli-Weizhou section officially began operations. Sanyuanli from Pazhou to Baiyun District in Haizhu District, on December 26, 2005, Wanshengwei Station was opened, and Sanyuanli-Wanshengwei Section of Guangzhou Metro Line 2 began its formal operation. Guangzhou Metro Line 2 is the Jiahe Wanggang-Guangzhou South Railway Station. It is a “North-South S-type” and has a total length of 31.8km. From Guangzhou South Railway Station in Panyu District to Jiahe Wanggang in Baiyun District, it can be located at Jiahe Wanggang Station. Transfer to the Baiyun Airport or Huadu District on the same line as Line 3, and you can also transfer to Guangzhou Metro Line 14 at this station in the future.
Adopt Huayi cable products:
1) RVV type copper core PVC insulated PVC sheathed flexible cable;
2) RVVP copper core PVC insulated and sheathed PVC sheathed flexible cable;
3) SYWV series physical foamed PVC insulated PVC sheathed coaxial cable;
4) BV type copper core PVC insulated wire;
5) WDZ-RYJY copper core cross-linked polyolefin insulated polyolefin sheathed cable (low smoke zero halogen flame retardant);
6) WDZ-RYJYP copper core cross-linked polyolefin insulated polyolefin sheath braided shielded cable (low smoke zero halogen flame retardant);
7) WDNH-RYYP copper core polyolefin insulated polyolefin sheath braided and shielded flexible cable (low smoke and halogen free fire);
8) DYWL-SYV series solid core polyolefin insulated PVC sheathed coaxial cable (low smoke and halogen free).
Guangzhou Metro Line 3
Introduction:
Guangzhou Metro Line 3 (North-South Express Line, the north extension section is called the Airport Line), is known as the busiest subway line in the Guangzhou Metro Line after the Guangzhou Metro Line 1, and the color is orange. The line runs in a "Y" shape from north to south, running through the new central axis of Guangzhou and the development axis of Panyu District from north to south. The northern extension of the subway line connects with Baiyun Airport and extends south to Guangzhou New City. Guangzhou Metro Line 3 has a total length of 64.41 kilometers, with 29 stations, 2 vehicle bases, 2 main substations, and 1 control command center with a total investment of RMB 15.905 billion. The line of the east extension section of Guangzhou Rail Transit Line 3 (Panyu Square ~ Haishu) is east-west, extending from Panyu Square Station to the east, passing the Asian Games Avenue, ending at Haishu Station, and the line is located in Panyu District. The total length of the line is about 9.58km, which is the underground line laying method; there are 4 stations in the whole line, including 1 transfer station; 1 parking lot is set up across the line.
Adopt Huayi cable products:
1) RV type copper core PVC connection software wire;
2) BV type copper core PVC insulated wire;
3) BVV type copper core PVC insulated PVC sheathed wire and cable;
4) RVS type copper core PVC insulated stranded flexible cable;
5) HYV series telephone line;
6) SYV series solid core polyolefin insulated PVC sheathed coaxial cable;
7) Super five types of network cable.
Guangzhou Metro Line 4
Introduction:
Guangzhou Metro Line 4 (English: Guangzhou MetroLine 4) is one of the routes operated by the Guangzhou Metro. Guangzhou Metro Line 4 has a total length of 43.65km. The representative color of the line is green. It is roughly north-south. It starts from Huangcun in Tianhe District in the north and Nansha Passenger Transport Port in Nansha District in the south (Jinzhou-Nansha Passenger Transport Port is under construction). It is the first in China. The rail transit line using linear motor technology is also the only rail transit line in Nansha District currently in operation. Guangzhou Metro Line 4 starts from the Guangdong Olympic Center in Tianhe District, along the southbound Daguan Road, then turns into Zhongshan Avenue and then turns into Checheng Road, then crosses the river to the east of Haizhu District, then enters Panyu District in the southeast and crosses Guangzhou. University City and Lishui Waterway, extending the aerial bridge on the ground in the southeast of the new town, paralleling the eastern section of the Guang'ao Expressway, crossing a large farmland in the eastern part of Panyu, and then passing through the eastern section of Shawan Waterway into Nansha District, walk along the middle of the city south avenue, then turn into the Phoenix Avenue and parallel with it, and finally transfer to Shuangshan Avenue and walk along the middle to the intersection of Shuangshan Avenue and Guangfeng Road.
Adopt Huayi cable products:
1) WDZN-RYS type copper core polyolefin insulated twisted connection flexible cable (low smoke and halogen free combustion resistant fire);
2) WDNH-RYYP copper core polyolefin insulated polyolefin sheath braided and shielded flexible cable (low smoke and halogen free fire);
3) WDZBN-BYJS copper core cross-linked polyolefin insulated stranded cable (low smoke zero halogen flame retardant B grade fire resistant);
4) DYWL-RYSP copper core cross-linked polyolefin insulated stranded braided shielded cable (low smoke and halogen free);
5) BV type copper core PVC insulated wire;
6) RVS type copper core PVC insulated stranded flexible cable;
7) RVV type copper core PVC insulated PVC sheathed flexible cable;
8) SYV series solid core polyolefin insulated PVC sheathed coaxial cable;
9) SYWV series physical foamed PVC insulated PVC sheathed coaxial cable;
10) Low-smoke, halogen-free, super-five network cable.
Guangzhou Metro Line 5
Introduction:
Guangzhou Metro Line 5 (English: Guangzhou MetroLine 5) is one of the operating routes of the Guangzhou Metro, belonging to urban rail transit, the representative color is red. The route is another east-west trunk line in the Guangzhou Metro Line. The current route starts from Liwan District in the west and Huangpu District in the east. The train consists of a 6-car L-type car. Guangzhou Metro Line 5 is roughly east-west, starting from the south side of Fangcun Avenue West and east of Suikou Bus Terminal. It crosses the Pearl River along the north side of the West Bridge of the Pearl River Bridge and the Pearl River Bridge, and enters the underground from the elevated road. Cross east through the intersection of Nan'an Road and Zhongshan Eight Road, then turn north to Pingxin New Village and cross a built-up area to Xicun Station. Then lay along the corridor of Huanshi Road. After passing through the south gate of the zoo, turn south to Yangsong Station. After passing through Wuyang New City, go east along Huacheng Avenue and cross the Zhujiang New Town to the northeast. Return to Huangpu Avenue, pass through Huangpu Avenue East, Keyun Road, Dongpu, Yuzhu and Maogang, and fold into Dashadi Road in Huangpu District. Rushing, the total length is about 40.5 kilometers.
Adopt Huayi cable products:
1) WDZN-RYS type copper core polyolefin insulated twisted connection flexible cable (low smoke and halogen free combustion resistant fire);
2) WDNH-RYYP copper core polyolefin insulated polyolefin sheath braided and shielded flexible cable (low smoke and halogen free fire);
3) WDZBN-BYJS copper core cross-linked polyolefin insulated stranded cable (low smoke zero halogen flame retardant B grade fire resistant);
4) DYWL-RYSP copper core cross-linked polyolefin insulated stranded braided shielded cable (low smoke and halogen free);
5) Low-smoke, halogen-free and super-five network cables.
Guangzhou Metro Line 8
Introduction:
Guangzhou Metro Line 8 (English: Guangzhou MetroLine 8) is one of the routes that the Guangzhou Metro has opened to traffic and belongs to the urban rail transit system. The representative color is blue-green. At present, the entire line is located underground, connecting Phoenix Xincun Station in Haizhu District to Wanshengwei Station. At present, the entire line is located in Haizhu District. It is also one of the only two routes in Guangzhou Metro that are in the same administrative district (the other is Guangzhou Metro Line 7). Line 8 of Guangzhou Metro is roughly in the direction of “L””, starting from Xingang East Road in Haizhu District, then going west, passing through the South China Expressway, Huangpuyong, Xingangzhong Road, passing through the village to enter Xingang West Road, and then wearing Xiaoyu. Hong Kong Interchange, extending westward along Changgang East Road, with Changgang Station and Line 2 interchange at the intersection with Jiangnan Avenue. The route continues west to the east side of Hedong Bridge, then turns to the northwest to enter Industrial Avenue, and finally reaches the Phoenix New Village, the terminal of the intersection of Industrial Avenue North and Nantian Road.
Adopt Huayi cable products:
1) RVV type copper core PVC insulated PVC sheathed flexible cable;
2) RVVP copper core PVC insulated and sheathed PVC sheathed flexible cable;
3) SYWV series physical foamed PVC insulated PVC sheathed coaxial cable;
4) BV type copper core PVC insulated wire;
5) WDZ-RYJY copper core cross-linked polyolefin insulated polyolefin sheathed cable (low smoke zero halogen flame retardant);
6) WDZ-RYJYP copper core cross-linked polyolefin insulated polyolefin sheath braided shielded cable (low smoke zero halogen flame retardant);
7) WDNH-RYYP copper core polyolefin insulated polyolefin sheath braided and shielded flexible cable (low smoke and halogen free fire);
8) DYWL-SYV series solid core polyolefin insulated PVC sheathed coaxial cable (low smoke and halogen free).
Metro Guangfo Line
Introduction:
Guangfo Metro is the first full-intermediate intercity rapid rail transit route across China, also known as Guangfo Line or Foshan Metro Line 1, spanning Guangzhou's Haizhu District, Liwan District and Foshan's Chancheng District. Nanhai District and Shunde District are east-west. By the end of 2016, the line started from Xincheng East in Foshan City and east to Yangang in Guangzhou, with a total length of 32.16 kilometers. There were 22 stations in the whole line, including 21.47 kilometers in Foshan City, 15 stations opened, and 11.67 kilometers in Guangzhou. 7 stations. At 14:00 on November 3, 2010, the first section of the first phase of Guangfo Metro (Quiqi Road Station - Xilang Station Section) was officially opened for trial operation, with a total length of 20.47 kilometers and a total of 14 stations. On December 28, 2015, the post-section of the first phase of Guangfo Metro (Xilang Station - Yangang Station) was officially opened for trial operation. On December 28, 2016, the second phase of Guangfo Metro Project (Quiqi Road Station - Xincheng East Station Section) officially opened for trial operation.
Adopt Huayi cable products:
1) NH-DYWL-RYYSP copper core cross-linked polyolefin insulated stranded braided shielded cable (low smoke and halogen free);
2) NH-RVS copper core PVC insulated stranded flexible cable (refractory);
3) DWYL-RYYSP copper core polyethylene insulated polyethylene sheath stranded braided shielded flexible cable (low smoke and halogen free).